ScreenPRO-II Controller • User’s Guide 185
5. System Setup
System Setup Sequence
póëíÉã=pÉíìé=pÉèìÉåÅÉ
This section provides a top level view of the entire ScreenPRO-II Controller setup
procedure, plus links to each individual procedure.
Preliminary steps:
1. “ID Setup and Remote Enable,” page 186.
2. “System Power Up,” page 187.
3. “Return to Factory Default,” page 189.
Next, set up all menus under the MISC heading:
4. “Touch Screen Calibration,” page 189.
5. “Programming EDID,” page 190.
6. “Restore from Flash Memory Card,” page 191.
Next, set up all menus under the System heading:
7. “Standard Destination Setup,” page 192.
8. “Router Setup,” page 193.
9. “AUX Destination Setup,” page 195.
10. “Input Patching,” page 198.
Next, set up all menus under the Output heading:
11. “Output Format Setup,” page 199.
12. “Sync Setup,” page 200.
13. “Genlock Setup,” page 201.
14. “Projector Setup,” page 202.
Set up all background inputs and primary sources:
15. “Background Setup,” page 205.
16. “Input Setup,” page 206.
17. “DSK Setup Procedure,” page 211.
18. “LOGO Setup Procedure,” page 212.
To complete your setup:
19. “Saving the Setup,” page 213.
20. “Backup to Flash Memory Card,” page 213.
All of the above procedures are covered in the following sections.
Important
For the optimum ScreenPRO-II Controller system setup, it is
recommended that you follow all procedures in the order
outlined below.
Comments to this Manuals