Barco R9002327 Installation Manual Page 25

  • Download
  • Add to my manuals
  • Print
  • Page
    / 55
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 24
INSTALLATION SET UP
INSTALLATION SET UP
4-6
INSTALLATION SET UP
4-6
INSTALLATION SET UP
5975069A BARCOVISION 708 200498
5975069A BARCOVISION 708 200498
A : Horizontal scan inversion
Three connectors are used, one for each horizontal deflection coil. When changing
the horizontal scan, insure that all three connectors are set in the same position. See
position of the connectors for the corresponding projector configuration.
B : Vertical scan inversion
Three connectors are used, one for each vertical deflection coil. When changing the
vertical scan, insure that all three connectors are set in the same position. See position
of the connectors for the corresponding projector configuration.
Top view of the connectors; upper three connectors for horizontal scan inversion,
lower three for vertical scan inversion.
C : Convergence connectors
Three connectors are used. The position of these connec-
tors has to be changed when switching from one configu-
ration to another.
With an open chassis, for a front-table or a rear ceiling
configuration, the connectors must be plugged in with the
contacts upwards (away from the tubes). For a front-
ceiling or rear-table configuration, the connectors must
be plugged in with the contacts facing the tubes
A : Horizontal scan inversion
Three connectors are used, one for each horizontal deflection coil. When changing
the horizontal scan, insure that all three connectors are set in the same position. See
position of the connectors for the corresponding projector configuration.
B : Vertical scan inversion
Three connectors are used, one for each vertical deflection coil. When changing the
vertical scan, insure that all three connectors are set in the same position. See position
of the connectors for the corresponding projector configuration.
Top view of the connectors; upper three connectors for horizontal scan inversion,
lower three for vertical scan inversion.
C : Convergence connectors
Three connectors are used. The position of these connec-
tors has to be changed when switching from one configu-
ration to another.
With an open chassis, for a front-table or a rear ceiling
configuration, the connectors must be plugged in with the
contacts upwards (away from the tubes). For a front-
ceiling or rear-table configuration, the connectors must
be plugged in with the contacts facing the tubes
Horizontal
scan
connectors
Vertical scan
con nect ors
Horizontal
scan
connectors
Vertical scan
connectors
Page view 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 54 55

Comments to this Manuals

No comments